Surmont

Surmont

SURMONT
START-UP: 2007
STATUS: Operating
CAPACITY: 148,000 bbl/day
PRODUCT: Diluted bitumen (SynBit)
OPERATOR: ConocoPhillips
OWNERSHIP: 50% ConocoPhillips • 50% Total
DATA SUBSCRIPTION:
Get access to our entire database of oil sands data (from Jan 2009), updated monthly. DETAILS →
 
FACILITY
SURMONT
START-UP
2007
REGION
Athabasca
FORMATION
Wabiskaw-McMurray
PROCESS
SAGD
CAPACITY
148,000 bbl/day bitumen
PRODUCT
Surmont Heavy Blend (SHB)
SPECS
19.5° API • 3.1% sulphur
EXPANSION
Surmont 2 Debottleneck Project • +40,000 bbl/day • TBD
Surmont 3 • +135,000 bbl/day • TBD

MONTHLY BITUMEN PRODUCTION & SOR


WELLS IN SERVICE

PIPELINES
PIPELINE
SYNBIT PRODUCT
SCO DILUENT
NAME
Waupisoo Pipeline
Cheecham Lateral
OPERATOR
Enbridge
Pembina Pipeline
LENGTH
30" Ø • 380 km
16" Ø • 56 km
SUPPLY
Cheecham Terminal
Syncrude Pipeline
TERMINAL
Edmonton, AB
Cheecham Terminal
UPDATED: SEP 8, 2019
SITE MAP: PROJECTS / IN-SITU / SURMONT
SOURCES:
CONOCOPHILLIPS • CANADIAN OPERATIONS: OIL SANDS
CONOCOPHILLIPS • CANADA: FACT SHEET • MAR 2019
AER UPDATES:
CONOCOPHILLIPS • 2019 SURMONT SAGD PERFORMANCE REVIEW • APR 2019
REGULATORY FILINGS:
CONOCOPHILLIPS • APPLICATION FOR APPROVAL OF SURMONT 2 PROJECT • JUN 2006
CONOCOPHILLIPS • APPLICATION FOR APPROVAL OF SURMONT 3 PROJECT (1 GB PDF) • JUN 2014
CONOCOPHILLIPS • SURMONT 2 DEBOTTLENECK PROJECT • JAN 2015
CONOCOPHILLIPS • SURMONT 3 PROJECT AMENDMENT • JUN 2015
CONOCOPHILLIPS • APPLICATION FOR NCG CO-INJECTION • OCT 2017
CONOCOPHILLIPS • APPLICATION TO INCREASE MAXIMUM OPERATING PRESSURE • NOV 2017
CONOCOPHILLIPS • APPLICATION TO USE CONDENSATE AS ALTERNATIVE DILUENT • JAN 2018
Great Divide

Great Divide

Jackfish

Jackfish