Christina Lake

Christina Lake

CHRISTINA LAKE
START-UP: 2008
STATUS: Operating
CAPACITY: 100,000 bbl/day
PRODUCT: Diluted bitumen
OPERATOR: MEG Energy
OWNERSHIP: 100% MEG Energy
DATA SUBSCRIPTION:
Get access to our entire database of oil sands data (from Jan 2009), updated monthly. DETAILS →
 
FACILITY
CHRISTINA LAKE
REGION
Athabasca
FORMATION
Wabiskaw-McMurray
PROCESS
SAGD
CAPACITY
100,000 bbl/day
PRODUCT
Access Western Blend (AWB)
SPECS
22° API • 3.9% sulphur
EXPANSION
Approved for 210,000 bbl/day
Phase 2B Brownfield • 13,000 bbl/day • H1/2020

MONTHLY BITUMEN PRODUCTION & SOR


WELLS IN SERVICE

PIPELINES
PIPELINE
DILUTED BITUMEN
DILUENT
NAME
Access Pipeline
OPERATOR
Wolf Midstream
LENGTH
300 km @ 42"
50 km @ 30"
345 km @ 24"
SUPPLY
Christina Lake
Stonefell Terminal
TERMINAL
Stonefell Terminal
Christina Lake
UPDATED: SEP 8, 2019
SITE MAP: PROJECTS / IN-SITU / CHRISTINA LAKE
SOURCES:
MEG ENERGY • CHRISTINA LAKE PROJECT
MEG ENERGY • CHRISTINA LAKE SITE MAP
MEG ENERGY • CHRISTINA LAKE: ANNUAL PERFORMANCE PRESENTATION • JUN 2019
REGULATORY FILINGS:
MEG ENERGY • CHRISTINA LAKE PHASE 3: PROJECT APPLICATION • APR 2008
MEG ENERGY • CHRISTINA LAKE PHASE 3: ENVIRONMENTAL IMPACT ASSESSMENT • APR 2008
MEG ENERGY • CHRISTINA LAKE PHASE 3: PUBLIC DISCLOSURE DOCUMENT • SEP 2007
Hangingstone Demo Plant

Hangingstone Demo Plant

Lindbergh

Lindbergh